Progress Report 1 (January 29, 2024 - February 14, 2024)

  • Initial website (React, Next.js) setup was complete.
  • Initial database (SQLLite) setup was complete.
  • Initial OpenCV (Python, Conda, respective OpenCV libraries) setup was complete.
  • The first version of the frontend was published.
  • Django, a backend administration tool, was configured.
  • A static 3D parking lot was created with rudimentary user controls.
  • Network topology was finalized for communication between the backend, frontend, and respective microservices.
  • The team inquired with ISU Public Safety and the Chief of Police to attain camera access to existing campus security cameras.

Progress Report 2 (February 19, 2024 - March 27, 2024)

  • Data formats for parking lots, rows, and spaces were revised to improve the serialization process.
  • The first version of the machine learning model was created. An algorithm was devised to identify row orientation.
  • The GitLab issue board was retouched to improve project management.
  • The first end to end call was completed between the backend and frontend to demonstrate basic product functionality and feasability.
  • The frontend interface was improved to include a lot selection feature.
  • Physical hardware, specifically a Raspberry Pi, was ordered, configured, and deployed to allow us to retrieve a live feed of campus parking Lot 33.
  • Basic statistics were added to the website to show availability history.

Progress Report 3 (March 28, 2024 - May 7, 2024)

  • A two-dimensional map was introduced to allow users to easily select parking lots.
  • The three-dimensional view was revised to not show specific parking lot lines, improving the UI.
  • Availability history graphs were touched up to only include history during peak hours.
  • Camera access was granted by ISU Public Safety, allowing us to utilize two Axis security cameras.
  • Axis security cameras were merged and fed to the model, giving us access to Lot 31's parking data.
  • A lot introspection and setup process was implemented, allowing lot administrators to setup a new lot with a single click.
  • Model parameters were finalized, improving performance under specific weather conditions.